West Midlands
Plug-in solar in Stoke-on-Trent
What a plug-in kit makes in Stoke-on-Trent, what your electricity costs here, and the compliant kits in stock ranked for this town.
- a typical kit, south at 30°
- 818 kWh/yr
- per kWh (West Midlands price cap)
- 25.6p
- best-value kit in stock
- £360
- to pay back, south-facing
- 3.8 yrs

PVGIS solar data
Output in Stoke-on-Trent by direction
| Facing | Tilted 30° (garden, roof) | Vertical (balcony, wall) | Chart |
|---|---|---|---|
| South | 818 kWh | 598 kWh | |
| South-east | 778 kWh | 558 kWh | |
| South-west | 774 kWh | 552 kWh | |
| East | 673 kWh | 424 kWh | |
| West | 667 kWh | 420 kWh | |
| North-east | 548 kWh | 263 kWh | |
| North-west | 545 kWh | 263 kWh | |
| North | 492 kWh | 178 kWh |
A typical 890 Wp kit with the 800W output cap, no shading. PVGIS 5.3 solar data. Method.
Live stock
Kits in stock, ranked for Stoke-on-Trent
Compliant kits you can order today, cheapest electricity first for this town.
ENA compliantCity Plumbing · 525 Wp
City Plumbing DMEGC 525W Hoymiles HiFlow Kit
£360
- kWh a year
- 483
- per kWh
- 7.6p
- payback
- 3.8 yrs
City PlumbingIn stock Buy
ENA compliantCity Plumbing · 475 Wp
City Plumbing DMEGC 475W Hoymiles HiFlow Kit
£336
- kWh a year
- 437
- per kWh
- 7.9p
- payback
- 3.7 yrs
City PlumbingIn stock Buy
ENA compliant
ENA compliantUKSOL · 1260 Wp
UKSOL Pro Max 1260W Hybrid Mount Kit
£989
- kWh a year
- 1136
- per kWh
- 8.9p
- payback
- 7.7 yrs
Plug In Solar LtdIn stock Buy- ENA compliant
Perlight Solar · 1000 Wp
Perlight PowerPlug MAX 1000W
£810
- kWh a year
- 919
- per kWh
- 9.0p
- payback
- 6.7 yrs
Plug In Solar LtdIn stock Buy
ENA compliantThunder Energy · 920 Wp
Thunder Bolt 920W Plug-In Solar Kit
£749.99
- kWh a year
- 846
- per kWh
- 9.1p
- payback
- 6.4 yrs
Thunder EnergyIn stock Buy
Cost per kWh = price ÷ estimated output over 10 years (0.5%/yr panel ageing). Output from PVGIS for your location, capped at 800W. How we calculate.
After you plug in
Your network operator is National Grid Electricity Distribution (West Midlands)
You must tell them about your kit before, or within 28 days of, plugging it in. How to register your kit, or check your DNO if you live near the edge of West Midlands.