West Midlands
Plug-in solar in Cheltenham
What a plug-in kit makes in Cheltenham, what your electricity costs here, and the compliant kits in stock ranked for this town.
- a typical kit, south at 30°
- 874 kWh/yr
- per kWh (West Midlands price cap)
- 25.3p
- nothing in stock right now
- –
- to pay back, south-facing
- – yrs

PVGIS solar data
Output in Cheltenham by direction
| Facing | Tilted 30° (garden, roof) | Vertical (balcony, wall) | Chart |
|---|---|---|---|
| South | 874 kWh | 636 kWh | |
| South-east | 830 kWh | 592 kWh | |
| South-west | 827 kWh | 587 kWh | |
| East | 715 kWh | 448 kWh | |
| West | 709 kWh | 445 kWh | |
| North-east | 579 kWh | 275 kWh | |
| North-west | 575 kWh | 274 kWh | |
| North | 518 kWh | 183 kWh |
A typical 890 Wp kit with the 800W output cap, no shading. PVGIS 5.3 solar data. Method.
Live stock
Kits in stock, ranked for Cheltenham
Compliant kits you can order today, cheapest electricity first for this town.
Nothing matches right now.
Stock changes quickly. Turn off “In stock now”, or set an alert and we’ll email you.
Get a restock alertCost per kWh = price ÷ estimated output over 10 years (0.5%/yr panel ageing). Output from PVGIS for your location, capped at 800W. How we calculate.
After you plug in
Your network operator is National Grid Electricity Distribution (West Midlands)
You must tell them about your kit before, or within 28 days of, plugging it in. How to register your kit.