Southern England
Plug-in solar in Bognor Regis
What a plug-in kit makes in Bognor Regis, what your electricity costs here, and the compliant kits in stock ranked for this town.
- a typical kit, south at 30°
- 1012 kWh/yr
- per kWh (Southern England price cap)
- 26.5p
- best-value kit in stock
- £360
- to pay back, south-facing
- 3.3 yrs

PVGIS solar data
Output in Bognor Regis by direction
| Facing | Tilted 30° (garden, roof) | Vertical (balcony, wall) | Chart |
|---|---|---|---|
| South | 1012 kWh | 728 kWh | |
| South-east | 947 kWh | 663 kWh | |
| South-west | 959 kWh | 679 kWh | |
| East | 797 kWh | 482 kWh | |
| West | 813 kWh | 507 kWh | |
| North-east | 626 kWh | 277 kWh | |
| North-west | 638 kWh | 289 kWh | |
| North | 558 kWh | 173 kWh |
A typical 890 Wp kit with the 800W output cap, no shading. PVGIS 5.3 solar data. Method.
Live stock
Kits in stock, ranked for Bognor Regis
Compliant kits you can order today, cheapest electricity first for this town.
ENA compliantCity Plumbing · 525 Wp
City Plumbing DMEGC 525W Hoymiles HiFlow Kit
£360
- kWh a year
- 597
- per kWh
- 6.2p
- payback
- 3.3 yrs
City PlumbingIn stock Buy
ENA compliantCity Plumbing · 475 Wp
City Plumbing DMEGC 475W Hoymiles HiFlow Kit
£336
- kWh a year
- 540
- per kWh
- 6.4p
- payback
- 3.2 yrs
City PlumbingIn stock Buy
ENA compliant- ENA compliant
Perlight Solar · 1000 Wp
Perlight PowerPlug MAX 1000W
£810
- kWh a year
- 1131
- per kWh
- 7.3p
- payback
- 6.1 yrs
Plug In Solar LtdIn stock Buy
ENA compliantThunder Energy · 920 Wp
Thunder Bolt 920W Plug-In Solar Kit
£749.99
- kWh a year
- 1045
- per kWh
- 7.3p
- payback
- 5.8 yrs
Thunder EnergyIn stock Buy
ENA compliantUKSOL · 1260 Wp
UKSOL Pro Max 1260W Hybrid Mount Kit
£989
- kWh a year
- 1368
- per kWh
- 7.4p
- payback
- 7.1 yrs
Plug In Solar LtdIn stock Buy
Cost per kWh = price ÷ estimated output over 10 years (0.5%/yr panel ageing). Output from PVGIS for your location, capped at 800W. How we calculate.
After you plug in
Your network operator is SSEN Distribution (Southern Electric Power Distribution)
You must tell them about your kit before, or within 28 days of, plugging it in. How to register your kit, or check your DNO if you live near the edge of Southern England.