North West England
Plug-in solar in Salford
What a plug-in kit makes in Salford, what your electricity costs here, and the compliant kits in stock ranked for this town.
- a typical kit, south at 30°
- 790 kWh/yr
- per kWh (North West England price cap)
- 26.5p
- best-value kit in stock
- £360
- to pay back, south-facing
- 3.8 yrs

PVGIS solar data
Output in Salford by direction
| Facing | Tilted 30° (garden, roof) | Vertical (balcony, wall) | Chart |
|---|---|---|---|
| South | 790 kWh | 581 kWh | |
| South-east | 752 kWh | 543 kWh | |
| South-west | 744 kWh | 531 kWh | |
| East | 649 kWh | 410 kWh | |
| West | 639 kWh | 400 kWh | |
| North-east | 528 kWh | 254 kWh | |
| North-west | 522 kWh | 252 kWh | |
| North | 473 kWh | 173 kWh |
A typical 890 Wp kit with the 800W output cap, no shading. PVGIS 5.3 solar data. Method.
Live stock
Kits in stock, ranked for Salford
Compliant kits you can order today, cheapest electricity first for this town.
ENA compliantCity Plumbing · 525 Wp
City Plumbing DMEGC 525W Hoymiles HiFlow Kit
£360
- kWh a year
- 466
- per kWh
- 7.9p
- payback
- 3.8 yrs
City PlumbingIn stock Buy
ENA compliantCity Plumbing · 475 Wp
City Plumbing DMEGC 475W Hoymiles HiFlow Kit
£336
- kWh a year
- 421
- per kWh
- 8.2p
- payback
- 3.7 yrs
City PlumbingIn stock Buy
ENA compliant
ENA compliantUKSOL · 1260 Wp
UKSOL Pro Max 1260W Hybrid Mount Kit
£989
- kWh a year
- 1097
- per kWh
- 9.2p
- payback
- 7.7 yrs
Plug In Solar LtdIn stock Buy- ENA compliant
Perlight Solar · 1000 Wp
Perlight PowerPlug MAX 1000W
£810
- kWh a year
- 886
- per kWh
- 9.3p
- payback
- 6.7 yrs
Plug In Solar LtdIn stock Buy
ENA compliantThunder Energy · 920 Wp
Thunder Bolt 920W Plug-In Solar Kit
£749.99
- kWh a year
- 816
- per kWh
- 9.4p
- payback
- 6.4 yrs
Thunder EnergyIn stock Buy
Cost per kWh = price ÷ estimated output over 10 years (0.5%/yr panel ageing). Output from PVGIS for your location, capped at 800W. How we calculate.
After you plug in
Your network operator is Electricity North West
You must tell them about your kit before, or within 28 days of, plugging it in. How to register your kit, or check your DNO if you live near the edge of North West England.