East of England
Plug-in solar in Aylesbury
What a plug-in kit makes in Aylesbury, what your electricity costs here, and the compliant kits in stock ranked for this town.
- a typical kit, south at 30°
- 894 kWh/yr
- per kWh (East of England price cap)
- 26.6p
- best-value kit in stock
- £360
- to pay back, south-facing
- 3.4 yrs

PVGIS solar data
Output in Aylesbury by direction
| Facing | Tilted 30° (garden, roof) | Vertical (balcony, wall) | Chart |
|---|---|---|---|
| South | 894 kWh | 655 kWh | |
| South-east | 850 kWh | 613 kWh | |
| South-west | 842 kWh | 600 kWh | |
| East | 731 kWh | 459 kWh | |
| West | 718 kWh | 453 kWh | |
| North-east | 588 kWh | 279 kWh | |
| North-west | 579 kWh | 276 kWh | |
| North | 523 kWh | 184 kWh |
A typical 890 Wp kit with the 800W output cap, no shading. PVGIS 5.3 solar data. Method.
Live stock
Kits in stock, ranked for Aylesbury
Compliant kits you can order today, cheapest electricity first for this town.
ENA compliantCity Plumbing · 525 Wp
City Plumbing DMEGC 525W Hoymiles HiFlow Kit
£360
- kWh a year
- 528
- per kWh
- 7.0p
- payback
- 3.4 yrs
City PlumbingIn stock Buy
ENA compliantCity Plumbing · 475 Wp
City Plumbing DMEGC 475W Hoymiles HiFlow Kit
£336
- kWh a year
- 477
- per kWh
- 7.2p
- payback
- 3.3 yrs
City PlumbingIn stock Buy
ENA compliant
ENA compliantUKSOL · 1260 Wp
UKSOL Pro Max 1260W Hybrid Mount Kit
£989
- kWh a year
- 1249
- per kWh
- 8.1p
- payback
- 7.2 yrs
Plug In Solar LtdIn stock Buy- ENA compliant
Perlight Solar · 1000 Wp
Perlight PowerPlug MAX 1000W
£810
- kWh a year
- 1005
- per kWh
- 8.2p
- payback
- 6.2 yrs
Plug In Solar LtdIn stock Buy
ENA compliantThunder Energy · 920 Wp
Thunder Bolt 920W Plug-In Solar Kit
£749.99
- kWh a year
- 925
- per kWh
- 8.3p
- payback
- 5.9 yrs
Thunder EnergyIn stock Buy
Cost per kWh = price ÷ estimated output over 10 years (0.5%/yr panel ageing). Output from PVGIS for your location, capped at 800W. How we calculate.
After you plug in
Your network operator is UK Power Networks (Eastern Power Networks)
You must tell them about your kit before, or within 28 days of, plugging it in. How to register your kit, or check your DNO if you live near the edge of East of England.